Bottom and top of elevator now shrunk to 250F. Reinforcing patches glued top and bottom.
More
Bottom and top of elevator now shrunk to 250F. Reinforcing patches glued top and bottom.
IMG_8285-1280x853.JPG (Waiting for the reinforcing patches to dry before I do the final shrink on the elevator - Trim tab already done.)