Bottom and top of elevator now shrunk to 250F. Reinforcing patches glued top and bottom.

                                                                                                                                                      More
Bottom and top of elevator now shrunk to 250F. Reinforcing patches glued top and bottom. IMG_8285-1280x853.JPG (Waiting for the reinforcing patches to dry before I do the final shrink on the elevator - Trim tab already done.)

Comments

No comments yet.

  •  

 

Photo info

Random image

Navigator

  • Bottom surface shrunk
  • Reinforcing patch glued around trim tab tube. (Bottom surface)
  • Reinforcing patch glued around trim tab tubes. (Bottom surface)
  • Top surface reinforcing patch.
  • Bottom and top of elevator now shrunk to 250F. Reinforcing patches glued top and bottom.
  • IMG_8287-1280x853.JPG
  • First row of rib stitches
  • First row of rib stitches
  • First row of rib stitching